3-38
Cisco UCS C3160 Rack Server Installation and Service Guide
OL-32062-01
Chapter 3 Maintaining the System
Installing or Replacing System Components
Additional CPU-Related Parts To Order With RMA Replacement Server Nodes
When a return material authorization (RMA) of the server node or CPU is done on a system, there are
additional parts that might not be included with the CPU or motherboard spare bill of materials (BOM).
The TAC engineer might need to add the additional parts to the RMA to help ensure a successful
replacement.
•
Scenario 1—You are re-using the existing heatsinks:
–
Heat sink cleaning kit (UCSX-HSCK=)
–
Thermal grease kit for C3160 (UCS-CPU-GREASE3=)
–
Intel CPU Pick-n-Place tool for EP CPUs (UCS-CPU-EP-PNP=)
•
Scenario 2—You are replacing the existing heatsinks:
–
Heat sink (UCSB-HS-01-EP=)
–
Heat sink cleaning kit (UCSX-HSCK=)
–
Intel CPU Pick-n-Place tool for EP CPUs (UCS-CPU-EP-PNP=)
A CPU heatsink cleaning kit is good for up to four CPU and heatsink cleanings. The cleaning kit contains
two bottles of solution, one to clean the CPU and heatsink of old thermal interface material and the other
to prepare the surface of the heatsink.
It is important to clean the old thermal interface material off of the CPU prior to installing the heatsinks.
Therefore, when ordering new heatsinks it is still necessary to order the heatsink cleaning kit at a
minimum.
Содержание UCS C3160
Страница 6: ...Contents vi Cisco UCS C3160 Rack Server Installation and Service Guide OL 32062 01 ...
Страница 10: ...x Cisco UCS C3160 Rack Server Installation and Service Guide OL 32062 01 ...
Страница 12: ...xii Cisco UCS C3160 Rack Server Installation and Service Guide OL 32062 01 ...
Страница 13: ...xiii Cisco UCS C3160 Rack Server Installation and Service Guide OL 32062 01 ...