3-45
Cisco UCS C3160 Rack Server Installation and Service Guide
OL-32062-01
Chapter 3 Maintaining the System
Installing or Replacing System Components
Step 4
Install a server node:
a.
With the two ejector levers open, align the new server node with the empty bay.
Note
The server node must be in the top bay, as shown in
Figure 1-2 on page 1-2
.
b.
Push the server node into the bay until it engages with the midplane connectors and is flush with the
chassis.
c.
Rotate both ejector levers toward the center until they lay flat and their latches lock into the rear of
the server node.
Step 5
Replace power cords and then power on the system by pressing and holding the power button on the front
handle for four seconds.
Step 6
Continue with
Enabling TPM Support in the BIOS, page 3-45
.
Figure 3-26
TPM Socket Location on the Server Node Board
Enabling TPM Support in the BIOS
Note
After hardware installation, you must enable TPM support in the BIOS:
Step 1
Enable TPM support:
a.
Watch during bootup for the F2 prompt, and then press
F2
to enter BIOS setup.
1
TPM socket and screw hole on motherboard
353465
1
Содержание UCS C3160
Страница 6: ...Contents vi Cisco UCS C3160 Rack Server Installation and Service Guide OL 32062 01 ...
Страница 10: ...x Cisco UCS C3160 Rack Server Installation and Service Guide OL 32062 01 ...
Страница 12: ...xii Cisco UCS C3160 Rack Server Installation and Service Guide OL 32062 01 ...
Страница 13: ...xiii Cisco UCS C3160 Rack Server Installation and Service Guide OL 32062 01 ...