4-2
Cisco SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-07
Chapter 4 Installation and Maintenance
Information About Preparing to Install the SCE 2000 Platform
Figure 4-1
SCE 2000 Dimensions
Tools and Parts Required
The SCE 2000 chassis is fully assembled at the factory, including the application and software packages.
No assembly is required. However, you need the following tools and equipment to install the SCE 2000
chassis and the rack-mount kit (if installing the SCE 2000 platform in a rack), fan modules, and power
supplies:
•
Number 1 and 2 Phillips screwdriver
•
1/4 inch flat-blade screwdriver
•
#¼” Hex Wrench
•
Screws compatible with your rack (for mounting the SCE 2000 to the rack)
•
12 AWG or 2.5-mm copper installation wire with hex or loop connectors for DC power leads
Ring terminals must be UL approved and suitable for 12 AWG wire.
•
Level (optional)
•
Tape measure (optional)
•
Appropriate cables to connect the SCE 2000 to the network and console terminal
•
Rack-mounting kit (optional)
•
A new AC-input or DC-input power supply
•
A new fan module
Table 4-1
SCE 2000 Dimensions
Dimension
Measurement
Height
3.47 inches (9.5 cm)
Width
17.4 inches (4.43 cm)
Depth
18 inches (4.6 cm)
Weight
33 lb (15 kg)
LINK RX
Cisco SCE
2000
Series
4xGBE
TX
RX
MM
TX
LINK RX TX
RX
MM
TX
LINK RX TX
RX
MM
TX
LINK RX TX
RX
MM
TX
GBE-1
SUB
LINE
NET
PWR B STATUS
PWR A
BYPASS
10/100/
1000
LINK/
ACTIVE
10/100/
1000
LINK/
ACTIVE
GBE-2
SUB LINE/CASCADE
NET
AUX
CONSOLE
MNG 2
MNG 1
92776
17.7 in.
3.47 in.
17.3 in.
1
2
3