C H A P T E R
7-1
Cisco SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-07
7
Basic SCE 2000 Platform Operations
Revised: July 27, 2009, OL-7824-07
Introduction
This chapter describes how to start up the SCE 2000
platform, reboot, and shutdown. It also describes
how to manage configurations.
•
Starting the SCE 2000 Platform, page 7-1
•
Managing SCE 2000 Configurations, page 7-4
•
How to Display the SCE Platform Version Information, page 7-8
•
How to Display the SCE Platform Inventory, page 7-9
•
How to Display the System Uptime, page 7-9
•
Rebooting and Shutting Down the SCE Platform, page 7-10
Starting the SCE 2000 Platform
The procedures for starting the SCE 2000 platform are explained in the following sections:
•
Checking Conditions Prior to System Startup, page 7-2
•
Performing Complex Configurations, page 7-2
•
Starting the System and Observing Initial Conditions, page 7-2
•