Maintain 3-inch clearance from top of the flex mount to nearest surface to ensure proper cooling.
Do not stack multiple switches on top of each other in the fixed vertical mounting orientation.
To collocate multiple switches, use top vertical mounting orientation as described in
Top Vertical
Mount
.
Warning
Figure 28: Inserting switch into flexible mount assembly
Top Vertical Mount
To install a single Catalyst Digital Building Series Switch in a flexible mount in top vertical mounting
orientation, follow these steps :
Catalyst Digital Building Series Switch Hardware Installation Guide
42
Switch Installation
Flexible Mounting
Содержание CDB-8P
Страница 56: ...Catalyst Digital Building Series Switch Hardware Installation Guide 46 Switch Installation Flexible Mounting ...
Страница 64: ...Catalyst Digital Building Series Switch Hardware Installation Guide 54 Switch Installation Flexible Mounting ...
Страница 70: ...Catalyst Digital Building Series Switch Hardware Installation Guide 60 Switch Installation Flexible Mounting ...
Страница 79: ...Catalyst Digital Building Series Switch Hardware Installation Guide 69 Switch Installation Rack Mounting ...
Страница 81: ...Catalyst Digital Building Series Switch Hardware Installation Guide 71 Switch Installation Rack Mounting ...