Switches require at least 3 inches of space above the heatsink fins for proper cooling. Do not
stack multiple switches on top of each other in horizontal mounting orientation. To collocate
multiple switches, use top vertical mounting orientation as described in
Top Vertical Mount
.
Warning
Figure 23: Inserting switch into flexible mount assembly
Vertical Mounting
Vertical Mounting can be done in two different positions:
Fixed Vertical Mount
To install a Catalyst Digital Building Series Switch in a flexible mount in fixed vertical mounting orientation,
follow these steps :
If you are using the flexible mount with a direct-wired junction box (CDB-MNT-FLEX-DIR), refer to the
Electrical Installation
section before you start the installation procedure.
Note
Before You Begin
•
Refer to
Installation Guidelines
section.
•
Refer to
Electrical Installation
section if you are using the flexible mount with direct-wired junction box
(CDB-MNT-FLEX-DIR).
Catalyst Digital Building Series Switch Hardware Installation Guide
36
Switch Installation
Flexible Mounting
Содержание CDB-8P
Страница 56: ...Catalyst Digital Building Series Switch Hardware Installation Guide 46 Switch Installation Flexible Mounting ...
Страница 64: ...Catalyst Digital Building Series Switch Hardware Installation Guide 54 Switch Installation Flexible Mounting ...
Страница 70: ...Catalyst Digital Building Series Switch Hardware Installation Guide 60 Switch Installation Flexible Mounting ...
Страница 79: ...Catalyst Digital Building Series Switch Hardware Installation Guide 69 Switch Installation Rack Mounting ...
Страница 81: ...Catalyst Digital Building Series Switch Hardware Installation Guide 71 Switch Installation Rack Mounting ...