Step 3
Slide the retainer through the first latch.
Figure 51: Sliding the Retainer Through the Latch (5RU 19" Rack Mount Chassis)
Figure 52: Sliding the Retainer Through the Latch (Flexible mount with IEC C14 power junction box)
Latch
3
AC power cord
1
Smaller sleeve for thin power cords
2
Catalyst Digital Building Series Switch Hardware Installation Guide
77
Switch Installation
Installing the Power Cord Retainer
Содержание CDB-8P
Страница 56: ...Catalyst Digital Building Series Switch Hardware Installation Guide 46 Switch Installation Flexible Mounting ...
Страница 64: ...Catalyst Digital Building Series Switch Hardware Installation Guide 54 Switch Installation Flexible Mounting ...
Страница 70: ...Catalyst Digital Building Series Switch Hardware Installation Guide 60 Switch Installation Flexible Mounting ...
Страница 79: ...Catalyst Digital Building Series Switch Hardware Installation Guide 69 Switch Installation Rack Mounting ...
Страница 81: ...Catalyst Digital Building Series Switch Hardware Installation Guide 71 Switch Installation Rack Mounting ...