Procedure
Step 1
Place the flexible mounts on a flat surface. Slide the four tabs at the bottom of the flexible mount into the
corresponding four slots of the other flexible mount at once. Following figures show the location of tabs and
slots on the flexible mount.
Figure 34: Tabs at the bottom of the flexible mount
Tabs
1
Catalyst Digital Building Series Switch Hardware Installation Guide
50
Switch Installation
Flexible Mounting
Содержание CDB-8P
Страница 56: ...Catalyst Digital Building Series Switch Hardware Installation Guide 46 Switch Installation Flexible Mounting ...
Страница 64: ...Catalyst Digital Building Series Switch Hardware Installation Guide 54 Switch Installation Flexible Mounting ...
Страница 70: ...Catalyst Digital Building Series Switch Hardware Installation Guide 60 Switch Installation Flexible Mounting ...
Страница 79: ...Catalyst Digital Building Series Switch Hardware Installation Guide 69 Switch Installation Rack Mounting ...
Страница 81: ...Catalyst Digital Building Series Switch Hardware Installation Guide 71 Switch Installation Rack Mounting ...