Index
IN-2
Cisco ASR 14000 Series Router 8-Slot Line Card Chassis Installation Guide
OL-16973-01
D
DC PDU power cable connections (figure)
DC PDU with safety cover (figure)
DC power
lug torque ranges
requirements
specifications
torque value for power connector screws
DC power systems
DRP card
installing
removing
troubleshooting
verifying installation
DRP card (figure)
DRP PLIM (figure)
DRP PLIMs
about
DRPs
about
E
ejector levers, operating (figure)
ejector levers and captive screws (figure)
electrostatic discharge, preventing
exhaust grille
installing
removing
exterior components
installing
removing
F
fabric card
(figure)
installing
removing
fan tray
installation steps for lower
installation steps for upper
installing lower
installing upper
removal steps for lower
removal steps for upper
removing lower
removing upper
fan tray (figure)
Figures
AC PDU
AC power rectifier
air filter (chassis)
air filter (power module)
airflow
bale-clasp SFP
cable management bracket
DC PDU power cable connections
DC PDU with safety cover
DRP card
ejector levers and captive screws
fan tray
front view of line card chassis
inlet grille
installing a pillow block
installing bale-claps SFP
installing MSC
installing PLIM
installing switch fabric card
MSC
MSC front panel
MSC impedance carrier
NEBS bonding and grounding
operating ejector levers