![Cinergia GE10 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/cinergia/ge10/ge10_installation-and-operation-manual_2607461029.webp)
GE AC Instalation and operation manual V10.docx
29
/ 63
Initialization
EMCY
sequence?
Standby
Yes
No
Enable?
Precharge
Yes
Ready
Run?
Enable?
No
Run
Yes
Yes
Run?
Enable?
Yes
No
Yes
Error
From any
Reset?
Yes
No
4.2.1.
Initialization
During the initialization, the power supply control system checks the presence of all internal
components and the embedded PC loads the operating system.
No voltage is present at the DC bus and the IGBTs PWMs are completely stopped.
The transition from Initialization state brings the power supply to the Standby state as long as
the emergency stop is deactivated (equipment armed).
4.2.2.
Standby
The Standby state keeps the power supply in low power mode until an Enable signal is received.
While the power supply is in standby only the internal power supplies are energized. In
particular, this means that there is no voltage in the DC link and no voltage/current is applied to
the output of the power supply.