![Cinergia GE10 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/cinergia/ge10/ge10_installation-and-operation-manual_2607461020.webp)
GE AC Instalation and operation manual V10.docx
20
/ 63
3.3.3.
Transport to location
The equipment includes castors to facilitate its transport to its final location.
It is important to check previously if the weight of the power supply is appropriate for the site
where it will be located.
It is also important to consider the most suitable means to place the power supply in its final
location (floor, hoist, lift, stairs, etc…).
3.3.4.
Location
It is necessary to leave a minimum of 25 cm in the contour of the equipment for its ventilation.
If possible, as shown in following figures, it is recommended to leave additional 75 cm to
facilitate the operations of maintenance of the equipment or the interventions of the technical
service in case of breakdown.
Recommendable minimum
distance, 1 m.
Re
co
m
m
en
da
bl
e
m
in
im
um
d
is
ta
nc
e,
1
m
.
Re
co
m
m
en
da
bl
e
m
in
im
um
d
is
ta
nc
e,
1
m
.