![Cinergia GE10 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/cinergia/ge10/ge10_installation-and-operation-manual_2607461018.webp)
GE AC Instalation and operation manual V10.docx
18
/ 63
Protection elements (Q*):
(Q1)
Input thermal-magnetic circuit breaker or disconnector according to power of the
equipment.
(Q2)
Output disconnector.
(Q3)
Output fuses (inside).
(Q4)
AC/DC switch (only DC case).
(Q5)
Parallel connection switch.
(Q7)
Isolation detector (which is inside the cabinet and it is optional).
Connection elements (X*):
(X1)
Phase input terminal R.
(X2)
Phase input terminal S.
(X3)
Phase input terminal T.
(X4)
Neutral input terminal N.
(X5)
Earth connection terminal for main supply input (
).
(X6)
Phase output terminal W.
(X7)
Phase output terminal V.
(X8)
Phase output terminal U.
(X9)
Neutral output terminal N.