![Cinergia GE10 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/cinergia/ge10/ge10_installation-and-operation-manual_2607461024.webp)
GE AC Instalation and operation manual V10.docx
24
/ 63
a)
Connecting an external Emergency pushbutton to
X12
(NC contact, without potential)
b)
Installing a cable bridge/shunt to close the circuit in terminal
X12
(in case an external
EPO is not used)
c)
Using the
X12
terminals to serialize an external Emergency Power Off sequence (
Figure
3
)
The figures below describe the connection of the EPO.
X12
EPO
(Emergency
Power Off)
Figure 2
: An External Emergency pushbutton (option a) or Cable bridge/shunt (option b) is
required
Figure 3
: connection to serialize the Emergency Power Off sequence (option c)
3.4.6.
Output signal of local Emergency Stop pushbutton (OPTIONAL)
In the standard units, there is no readback signal of the position of the local Emergency Stop
pushbutton located in the front panel. On request (OPTION), it is possible to add a Normally
Closed output contact of the front panel Emergency pushbutton.
In this case, the Emergency Stop pushbutton installed on the front panel of equipment has two
normally closed (NC) output contacts: one NC contact is used for the internal emergency
sequence of the equipment; and the second NC contact is wired to the lower front of the
equipment, along with the connection power terminals.
The additional contact could be used by the customer to integrate CINERGIA equipment into the
Emergency Power Off sequence of the installation.