![Ciena 170-3930-900 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/ciena/170-3930-900/170-3930-900_hardware-installation-and-start-up-manual_2606954033.webp)
Installation
2-17
3930 Service Delivery Switch
Hardware Installation and Start-up Manual
009-3223-001 Standard Revision E
Copyright
©
2012-2014 Ciena
®
Corporation
January 2014
Procedure 2-2
To Install 3930 in a Frame
Two frame mounting brackets are available. Use the one that suits your
installation.
Step
Action
1
Install the frame bracket on the chassis as instructed in either:
•
“Installing the 19” Frame Mount Bracket - 1 RU” on page 8-8
•
“Installing the 23” Frame Mount Bracket - 1 RU” on page 8-10
Note:
If your installation location does not allow rear access to the chassis,
the supplemental ground cable needs to be routed and connected to the rear
of the chassis before mounting the chassis.
2
Install supplemental ground. See
“Installing Supplemental Ground” on page
3
Install the power supplies and connect power. Both AC and DC power supply
modules are available. For detailed instructions see either:
•
“Installing an AC Power Supply” on page 2-19
•
“Installing a DC Power Supply” on page 2-21
Verify that the PWR LED on the front of the device is green.
4
Install the alarm cable (if required). See
.
5
Install SFP/SFP+ optics, see
“To Install a Pluggable Optic” on page 2-26
.
6
Install faceplate cabling for the UNI and NNI connections. See
Installation and Guidelines” on page 2-10
Note:
Dress and secure the cables using local practices, ensuring that the
weight of the cable is supported and does not drag on the plug.
You have installed the 3930 in a frame.
Содержание 170-3930-900
Страница 103: ......