![Ciena 170-3930-900 Скачать руководство пользователя страница 93](http://html1.mh-extra.com/html/ciena/170-3930-900/170-3930-900_hardware-installation-and-start-up-manual_2606954093.webp)
Mounting Options
8-7
3930 Service Delivery Switch
Hardware Installation and Start-up Manual
009-3223-001 Standard Revision E
Copyright
©
2012-2014 Ciena
®
Corporation
January 2014
Figure 8-4
Right Side Application
3
Position the unit against the wall and mark the location of the two screw holes
for the upper bracket.
Note:
The mounting holes are 5” center to center.
4
Drill the holes for the upper bracket into the reinforced mounting surface.
5
Install the anchors/fasteners and mounting screws into the two holes.
6
Using the keyhole slots on the upper bracket, hang the chassis on the
mounting surface.
7
Mark the location of the two screw holes in the lower bracket.
Note:
Bottom screws should be centered on the bottom of the keyhole. This
ensures that the unit cannot be removed from the wall without removing the
bottom screws. The vertical distance between the upper and lower mounting
holes is 20.1" center to center.
8
Remove the chassis from the wall and set it aside.
9
Drill the holes for the lower bracket into the reinforced mounting surface.
10
Install the anchors/fasteners into the two holes.
11
Using the keyhole slots on the upper bracket, hang the chassis on the
mounting surface.
12
Install two screws into the fasteners for the lower bracket.
Note:
Both the upper and lower mounting brackets need to be securely
fastened to the mounting surface to properly support the unit.
13
Dress and secure the cables using local practices. Ensure that the weight of
the cable is supported and does not drag on the plug. For detailed cabling
information, see the hardware install manual for the unit.
You have successfully mounted the unit.
Front of
Chassis
Содержание 170-3930-900
Страница 103: ......