![Ciena 170-3930-900 Скачать руководство пользователя страница 94](http://html1.mh-extra.com/html/ciena/170-3930-900/170-3930-900_hardware-installation-and-start-up-manual_2606954094.webp)
8-8
Mounting Options
3930 Service Delivery Switch
Hardware Installation and Start-up Manual
009-3223-001 Standard Revision E
Copyright
©
2012-2014 Ciena
®
Corporation
January 2014
Procedure 8-2
Installing the 19” Frame Mount Bracket - 1 RU
Step
Action
1
Align the holes of the mounting bracket with the holes on the side of the unit
(see
•
3930, 3932, 3940, 3960, 5142 and 5160 — install screws in holes 1
and 2.
•
3920 — install screws in holes 5 and 6.
Note:
When mounting a 3920, install the screws in the set of holes on the
side of the chassis that is located closest to the middle of the chassis.
Note:
When correctly installed, the mounting flange will be recessed
approximately 2 inches from the front faceplate of the chassis.
Figure 8-5
Mounting bracket, with holes labeled
2
Repeat
to install the second bracket.
3
Position the chassis in place in the frame.
4
Install four customer supplied screws in the slots on both the left and right
brackets.
5
Tighten all screws to ensure they make a firm connection between the
bracket and the frame.
6
Install the cable supports on the mounting brackets using the available screw
position and the two longer 8-32 screws provided in the kit. One screw is used
per bracket.
shows the Cable Supports installed on
the mounting bracket.
Содержание 170-3930-900
Страница 103: ......