Cichewicz MOC 20 Скачать руководство пользователя страница 5

 

12/03/12 

7.

 

Do not store near combustible materials boiler. 

8.

 

The device is powered by electricity 230V/50Hz. Improper repair or improper installation 
can cause danger to life by electric shock. 

9.

 

Do not block ventilation openings or close the supply and exhaust boiler room. 

10.

 

Regularly clean the boiler, burner and the exhaust. 

 

Failure to follow these guidelines risk damage to health or life threatening. 

 
 
 
 
 
Safe distance from flammable materials. 

 

 during  installation  and  use  of  the  burner  must  be  kept  200  mm  distance  from  the 

mid-combustible materials. 

 

 

 

during  installation  and  use  of  the  burner  must  be  kept  400  mm  distance  from 

flammable materials, especially C3 (paper, wood, plastic, etc.;)

 

 

if the flammability of materials is very large distances must be doubled

.  

 
Table:

 

Flammability class:

 

Materials 

 

– 

Non-flammable

 

Sandstone, concrete, bricks, plaster made of non-combustible material, ceramic tiles, granite

 

B – 

Slow-burning

 

The surface of cement-wood, fiberglass

 

C

1

 – hard-burning  

Beech, oak wood, plywood

 

C

2

 – medium-burning  

Pine, larch wood, spruce wood, cork, rubber base

 

C

3

 – easy-burning  

asphalt, celluloid, polyurethane, polystyrene, plastic, PVC

 

 
 
 
5. Burner’s installation and requirements. 

Tips for Installer: 
During the installation of the burner as well as its use must comply with applicable rules: 
- supply and exhaust ventilation, boiler room,  
- flue gas canals 
- technical equipment and water heating systems security. 
- technical conditions of boiler rooms . 
 
Location and mounting requirements 
“MOC” burner is designed for installation in solid fuel boilers or oil boilers installed in rooms that 
meet the conditions of the boiler room built for solid fuel. 
- The room where the burner is to be installed must be dry, free from the vapors of flammable and 
corrosive substances. 
- In the surroundings of the burner temperature should not exceed 50 ° C and should not be less than 
0 ° C. 
- The air humidity should be in the range from 10% to 80% without condensation. 
 
Installation of the burner should be preceded by checking the possibilities of adapting the boiler to 
the burner and the fulfillment of the requirements: 
- Location of the burner assembly must take into account conduct maintenance and service. It 
should provide about 50 cm. free space around the burner. 

Содержание MOC 20

Страница 1: ...reate a danger for end user Table of Contents 1 Admission 2 Purpose burners 3 Design and technical specification 4 Safety 5 Burner s installation and requirements 6 Operation 7 Maintenance 8 Problems...

Страница 2: ...erformed in accordance with applicable standards and regulations Required fuel Wood pellet 6 8mm cross section length 5 30mm ash content max 2 The maximum moisture content of pellets should not exceed...

Страница 3: ...let feeding tube 3 Electrical connector Plug 4 Internal burner feeder Stoker 5 Furnace heat shield 6 Cast iron grill 7 Furnace body 8 Electric igniter 9 The air fan 10 Burner s steel cover Picture 2 B...

Страница 4: ...er are delivered in one box nr1 and feeding screw is in separate box nr 2 Picture 3 Transportation package 4 Safety Safety Tips 1 Starting the burner and its operation can be effected only by adults a...

Страница 5: ...Pine larch wood spruce wood cork rubber base C3 easy burning asphalt celluloid polyurethane polystyrene plastic PVC 5 Burner s installation and requirements Tips for Installer During the installation...

Страница 6: ...the burner mounting hole in existing door or additional mounting plate Opening dimensions in Picture 2 dimensions of the burner 2 Seal the space between the burner and door gasket with non combustibl...

Страница 7: ...roperly selected circuit breaker or fuse over current and residual current circuit breaker For this line do not connect any other electrical appliances Power burner must be connected via an additional...

Страница 8: ...8 12 03 12 Electrical wiring diagrams of other external devices are in manual book of each controller...

Страница 9: ...resistant materials and be warmed throughout Allowed brick chimneys provided a good thermal insulation of the chimney Section of the flue from the boiler to the chimney flue should have called a sligh...

Страница 10: ...space led to the roof of at least 1 5 m flue should be made of noncombustible material 6 Operation Start up burner Preparation for start up should include a general overview of the technical condition...

Страница 11: ...o observe the changes The fine adjustment is recommended for analysis of exhaust To adjust the power of the burner set working hours and time off work enough to feed pellet was delivered within 1 hour...

Страница 12: ...the fan Before each heating season remove the burner and fan with a brush or compressed air to clear the shoulders of pollution Replacing the igniter Electric igniter is used to fire the pellet is a...

Страница 13: ...atically No fuel Fill up the fuel In the fuel Silo Improper adjustment of start pellet amount time lighting power fan Readjust Dirty burner Clean the combustion chamber of the burner Defective igniter...

Страница 14: ...ectrical connector 8 Back part of the burner 9 Sealing of the stoker tube 10 Sealing the back cover 11 Igniter 12 Internal burner s feeder stoker 13 Feeding tube pipe 14 Back Cover 15 Gear motor with...

Страница 15: ...ling cords gaskets thermal plate burner grate and burner ignition Damage to mechanical thermal chemical caused by improper operation or failure to maintain control of the boiler Damage caused by elect...

Отзывы: