Cichewicz MOC 20 Скачать руководство пользователя страница 2

 

12/03/12 

 
1. Admission. 
Thank you for the trust You have given the company. for purchasing our burner and we hope that it 
will  be  a  long  and  safe  to  serve  You  as  a  cheap  and  reliable  source  of  heat.  Range  of  burners 
“MOC” is recommended for users looking for automated solutions in the combustion of biomass - 
pellet 

 

 

2. Purpose burners „MOC” 
“MOC”  burners 15-60kW burning wood granules (pellets) are the optimal devices designed for use 
with solid fuel boilers with outputs ranging from 15 to 60 kW. “MOC” burners are designed so that 
its  use  during  operation  and  maintenance  costs  were  relatively  low.  With  a  horizontal  furnace 
burner can be mounted in many boilers for solid fuel without major modifications to these devices.  
With the pellet’s burner using comfort we get closer to the oil boilers. 
 
All work on the boiler equipment, the mounting position of the burner and its operation must 
be performed in accordance with applicable standards and regulations ! 
 
Required fuel

Wood pellet 6-8mm cross section , length 5-30mm, ash content max. 2%. 
The maximum moisture content of pellets should not exceed more then 10%. 
The calorific value of the pellets should be greater than 17,5 MJ/kg. 
Pellets made in accordance with Standard: 

 

ÖNORM (M7135) or DIN-Norm (DIN-Norm 51 731). 

 

Cross section: 6-8 mm, length: 5–30 mm  

 

Max. Ash content 2% 

 

Calorific value > 17,5 MJ/kg 

 

           

 

 

 
 
 
 
 
 
 
3. Design and technical specification. 
The construction enables the exchange of components that are subject to rapid wear without having 
to replace the  entire burner, which significantly  reduces  equipment maintenance costs. The burner 
has an automatic ignition system of fuel and flame control. 
Fuel is delivered by the feeding screw, which is combined with the flexible wire burner. Additional 
feeder  (called  “Stoker”)  inside  the  burner  provide  the  correct  dosage  of  fuel  into  the  combustion 
chamber and protects the flash fire back into the pellets storage.  
 
The burner in the boiler (depending on its design) is achieved efficiencies of up to 92%.  

Содержание MOC 20

Страница 1: ...reate a danger for end user Table of Contents 1 Admission 2 Purpose burners 3 Design and technical specification 4 Safety 5 Burner s installation and requirements 6 Operation 7 Maintenance 8 Problems...

Страница 2: ...erformed in accordance with applicable standards and regulations Required fuel Wood pellet 6 8mm cross section length 5 30mm ash content max 2 The maximum moisture content of pellets should not exceed...

Страница 3: ...let feeding tube 3 Electrical connector Plug 4 Internal burner feeder Stoker 5 Furnace heat shield 6 Cast iron grill 7 Furnace body 8 Electric igniter 9 The air fan 10 Burner s steel cover Picture 2 B...

Страница 4: ...er are delivered in one box nr1 and feeding screw is in separate box nr 2 Picture 3 Transportation package 4 Safety Safety Tips 1 Starting the burner and its operation can be effected only by adults a...

Страница 5: ...Pine larch wood spruce wood cork rubber base C3 easy burning asphalt celluloid polyurethane polystyrene plastic PVC 5 Burner s installation and requirements Tips for Installer During the installation...

Страница 6: ...the burner mounting hole in existing door or additional mounting plate Opening dimensions in Picture 2 dimensions of the burner 2 Seal the space between the burner and door gasket with non combustibl...

Страница 7: ...roperly selected circuit breaker or fuse over current and residual current circuit breaker For this line do not connect any other electrical appliances Power burner must be connected via an additional...

Страница 8: ...8 12 03 12 Electrical wiring diagrams of other external devices are in manual book of each controller...

Страница 9: ...resistant materials and be warmed throughout Allowed brick chimneys provided a good thermal insulation of the chimney Section of the flue from the boiler to the chimney flue should have called a sligh...

Страница 10: ...space led to the roof of at least 1 5 m flue should be made of noncombustible material 6 Operation Start up burner Preparation for start up should include a general overview of the technical condition...

Страница 11: ...o observe the changes The fine adjustment is recommended for analysis of exhaust To adjust the power of the burner set working hours and time off work enough to feed pellet was delivered within 1 hour...

Страница 12: ...the fan Before each heating season remove the burner and fan with a brush or compressed air to clear the shoulders of pollution Replacing the igniter Electric igniter is used to fire the pellet is a...

Страница 13: ...atically No fuel Fill up the fuel In the fuel Silo Improper adjustment of start pellet amount time lighting power fan Readjust Dirty burner Clean the combustion chamber of the burner Defective igniter...

Страница 14: ...ectrical connector 8 Back part of the burner 9 Sealing of the stoker tube 10 Sealing the back cover 11 Igniter 12 Internal burner s feeder stoker 13 Feeding tube pipe 14 Back Cover 15 Gear motor with...

Страница 15: ...ling cords gaskets thermal plate burner grate and burner ignition Damage to mechanical thermal chemical caused by improper operation or failure to maintain control of the boiler Damage caused by elect...

Отзывы: