47
Step 8
Disconnect the AC and DC switches of inverter #1.
Step 9
Perform step 3-8 to inverter #2. Make sure all two inverters can operate normally.
Step 10
Set the inverter output power to the default value through LCD display.
Step 11
Close the AC and DC switches of the two inverters (The number of DC input is
determined according to the actual situation).
Step 12
Perform Start operation through the LCD display; all two inverters operate normally.
NOTE:
To ensure the inverter normal operation for the first time, please measure the inverter
DC input voltage beforehand. When the DC side voltage meets the start-up
requirement, i.e. DC voltage is steadily lower than DC start-up voltage. Start the
inverter for the first time.
7.6 LCD Parameter Setting
When the LCD is on, set the LCD display language, data and time, communication parameters,
and active power limitation etc. according to Chapter 9: LCD Operation in this manual. You can
also view the inverter running information and perform pertinent operation.
7.7 Completing Commissioning
If all the start-up procedures have been performed, check the operating condition of the container.
Check whether there are anomalies of the inverter: abnormal noise, overheating, smoking or
unusual odor.
Check the inverter grid-connected voltage, current and THD for unstableness.
Check the grounding of the inverter enclosure.
Check the functionality of the LCD display.
Record accurately the inverter operation data during commissioning.
The duration of commissioning depends on the plant scale, plant location, on-site environmental
conditions and so on. Usually, if the in-site condition is good, the commissioning can last for 1
week, i.e. 168 hours.
The commissioning of the inverter is completed. Inverter operates normally.
After commissioning, plant starts power generation and enters daily maintenance process.
WARNING:
After the container is operating, make sure there are no flammable materials at least 5
meters around the installation site.
Local/national standards about the min. electric clearance around the container should
be respected.
NOTICE:
Container needs no manual control in daily operation. Open the cabinet door only for
maintenance or troubleshooting and by qualified personnel only.
Keep the door closed and locked and store the keys of the door by appointed
personnel during normal operation.