28
NOTE:
Pre-bury grounding units according to relevant standards of the country/region where
the project is located.
5.4.4 Other Precautions
NOTICE:
A drainage system should be designed on the installation site to prevent the container
from being immersed in water during heavy rain falls.
NOTICE:
Do not plant any trees near the container installation site to prevent the damage of
container by tree leaves or stems.
5.5 Fixing the Container
Check to ensure that the foundation construction has met all the local standards and other relevant
requirements.
Hoist the container onto the foundation after the foundation is dry enough.
Container front view
Figure 5-5 Hoisting position
Weld the container base with the 4 pre-buried steel plates by using 6# steel angles. Anti-rust
treatment for the container and foundation should also be done.
5.6 Flashings Installation
5.6.1 Brief Introduction
It is recommended to install the flashings after the container is installed and fixed. The flashings
can also be installed before the container is fixed. You can also install according to the actual
Содержание CPS PSW1.5M-1500V
Страница 1: ...CPS PSW1 5 3M 1500V Inverter Container User Manual ...
Страница 27: ...26 Container front view 1 2 ...