
ENGLISH
.
Cod. 9828093300 00 - Vers. 04/2019 - 61
21.0 GENERAL ROUTINE MAINTENANCE (REQUIRES TRAINED PERSONNEL)
BEFORE PERFORMING ANY TYPE OF SERVICING, THE MACHINE MUST BE SHUT DOWN AND ISOLATED FROM THE
MAINS POWER AND COMPRESSED AIR DISTRIBUTION NETWORK.
MAINTENANCE PROGRAMME
These service intervals are recommended for non-dusty and well-ventilated environments.
For particularly dusty environments, the frequency of controls must be doubled
Every day (after use)
◼
Check the automatic drainage of the condensate (dryer) and cyclone water separator (WSD -
optional) if present.
Every 50 running hours
◼
Drain the condensate from the oil catcher
◼
Check the oil level
◼
Clean the filter of the automatic condensate drain (dryer)
IVR only
◼
Clean the filters of the electrical cabinet
Every 500 hours
◼
Tightness of electrical cables (first 500 hours)
◼
Clean the air intake filter
◼
Clean the condenser coil (for dryer, if present)
◼
Clean the impurity filter of the automatic condensate drain (dryer)
Every 2000 hours
◼
Replace the intake filter
◼
◼
Replace the oil
◼
◼
Replace the oil filter
◼
◼
Re-tightening of electrical cables in cabinet
◼
◼
Temperature test for safety
◼
◼
Replace the impurity filter of the automatic condensate drain (dryer)
Every 4000 hours
◼
◼
Clean the finned surface of the air-oil cooler
◼
◼
Replace the oil separator filter
◼
◼
Replace the air intake panel filter
◼
◼
Maintenance kit of automatic condensate drain (dryer)
IVR only
◼
Replace the air intake filters of the electrical cabinet
IVR only
◼
◼
Greasing of electric motor bearings
Every 8000 hours
◼
◼
Change check valve
◼
◼
Intake valve service kit
◼
◼
Servicing of oil return valve and inspection of oil tubes
◼
◼
Minimum pressure valve and thermostatic valve service kit
◼
◼
Change the oil (if RXD used)
IVR only
◼
◼
Visual inspection of elastic element of motor-compressor coupling
Every 24000 hours
◼
◼
Kit revision of the compressor unit
◼
◼
Service kit Motor (bearings)
N.B. OPERATIONS MARKED BY
◼
ARE DESCRIBED IN PART “A” OF THIS MANUAL IN CHAP. 15.2