12.0 INSTALLATION
12.1 POSITIONING
After having unpacked and set up the compressor room, position the machine, performing the following checks:
•
check that there is sufficient space around the machine for servicing (see Fig. 11)
CHECK THAT THE OPERATOR HAS A FULL VIEW OF ALL THE EQUIPMENT FROM THE CONTROL PANEL AND CHECK
THAT THERE ARE NO UNAUTHORISED PERSONS IN THE VICINITY OF THE MACHINE.
12.2 ELECTRICAL CONNECTION
•
Check that the supply voltage corresponds to the value on the machine data plate.
•
Check the condition of the line conductors and for the presence of an efficient ground conductor.
•
Check for the presence, upstream of the machine, of a circuit breaker switch with automatic overcurrent protection equipped with
differential device (Ref. 1 for screw compressor and Ref. 2 for dryer), see the wiring diagram.
•
Connect the electrical cables of the machine with utmost care in compliance with current standards. Such cables must be developed as
indicated by the machine’s wiring diagram.
•
Check the cables connected to the terminal block of the electrical cabinet and make sure they are properly tightened
(tightening
torque provided in wiring diagram)
.
The torque of the electrical terminal screws must be checked after the first 50 running hours.
ACCESS TO THE ELECTRICAL CABINET IS ALLOWED ONLY BY PROFESSIONALLY QUALIFIED PERSONNEL. BEFORE
OPENING THE DOOR OF THE ELECTRICAL CABINET, DISCONNECT THE POWER.
COMPLIANCE WITH LEGISLATION IN FORCE REGARDING ELECTRICAL INSTALLATIONS IS ESSENTIAL TO ENSURE
THE SAFETY OF WORKERS AND PROTECTION OF THE MACHINE
THE CABLES, PLUGS AND ANY OTHER TYPE OF ELECTRICAL MATERIAL USED TO MAKE THE CONNECTION MUST
BE SUITABLE FOR USE AND SATISFY THE REQUIREMENTS OF LEGISLATION IN FORCE.
FIG. 11
1
2
SPACE FOR SERVICING
MINIMUM 1.5 m (in) 59
PROTECT THE POWER
CORD WITH A SUITABLE
RACEWAY
POWER CORD SCREW
COMPRESSOR - THREE-PHASE -
POWER CORD DRYER - SINGLE
PHASE -
POWER CORD SCREW COMPRESSOR -
THREE-PHASE -
MINIMUM 1.5 m (in) 59