![Chicago Pneumatic CPF 175 Скачать руководство пользователя страница 120](http://html.mh-extra.com/html/chicago-pneumatic/cpf-175/cpf-175_instruction-book_2598872120.webp)
Step
Action
8
This vessel and other parts under pressure have been designed and built to guarantee an
operational lifetime in excess of 20 years and an infinite number of pressure load cycles.
A visual inspection (for damage, non-authorized alterations,...) of the vessel (at the outside
and inside) is recommended every 5 years. Make sure the vessel is fully depressurized
and isolated before carrying out an internal inspection.
9
At every inspection, also check the oil drain flexible. Replace if there is any wear or
damage.
Instruction book
118
2920 1804 00
Содержание CPF 175
Страница 1: ...CPF 175 CPVS 175 Instruction book ...
Страница 2: ......
Страница 7: ...11 Declaration of conformity 148 Instruction book 2920 1804 00 5 ...
Страница 15: ...2 2 Air and oil system Flow diagrams Flow diagram air cooled compressor Instruction book 2920 1804 00 13 ...
Страница 18: ...Flow diagram water cooled compressor with modulating control Instruction book 16 2920 1804 00 ...
Страница 33: ...Menu structure for fixed speed compressors Instruction book 2920 1804 00 31 ...
Страница 34: ...Menu structure for variable speed compressors Instruction book 32 2920 1804 00 ...
Страница 60: ...Fixed speed compressors Instruction book 58 2920 1804 00 ...
Страница 72: ...Fixed speed compressors Instruction book 70 2920 1804 00 ...
Страница 104: ...Electrical connections for IEC variable speed compressors Instruction book 102 2920 1804 00 ...
Страница 105: ...Electrical connections for CSA UL fixed speed compressors Instruction book 2920 1804 00 103 ...
Страница 151: ......
Страница 152: ...No 2920 1804 00 2012 08 ...