Commissioning
Important notes
5
Commissioning
5.1
Important notes
Incorrect settings during commissioning may cause unexpected and dangerous motor and system
movements.
Possible consequence: death, severe injuries or damage to property
▶
Clear hazardous area.
▶
Observe safety instructions and safety clearances.
5.2
Before initial switch-on
Prevent injury to persons and damage to property. Check the following before switching on the mains
voltage:
•
Is the wiring complete and correct?
•
Are there no short circuits and earth faults?
•
Is the motor circuit configuration (star/delta) adapted to the output voltage of the inverter?
•
Is the motor connected in-phase (direction of rotation)?
•
Does the "emergency stop" function of the entire plant operate correctly?
WARNING!
Содержание Emotron VS10 Series
Страница 1: ...Emotron VS10 VS30 AC drive 0 25 2 2 kW Mounting and switch on instruction ...
Страница 2: ...Diese Seite wurde absichtlich leer gelassen ...
Страница 10: ...10 4 Mounting Mechanical installation Dimensions VS10 VS30 0 55 kW 0 75 kW All dimensions in mm ...
Страница 11: ...11 Mounting Mechanical installation 4 Dimensions VS30 1 1 kW 2 2 kW All dimensions in mm ...