2
Preparation before use
2.1 Preparation before Operation
2.1.1
Unpacking
2.1.1.1 Appearance inspection
Step 1
Check if there is any damage in the outer packaging and the anti-vibration packaging of the
instrument. If no damage is found, keep the packaging in case of future need and continue the
inspection as per the following steps.
Step 2
Unpack the instrument and check for any damage to the main unit and attached items.
Step 3
Verify the items in the packaging box carefully by cross-checking with Table 2.1;
Step 4
If the outer packing box, instrument or any attached item is damaged or incorrect, it is forbidden
to power on! Please contact our service center via the service hotline indicated on the cover,
and we will make repairs and replacements rapidly based on individual circumstances.
Handling:
As the instrument and its packing carton are heavy, they should be moved by two persons at
the same time and be handled with care.
2.1.1.2 Model confirmation
Table 2.1 Packing List of Series 3672
Name
Quantity Function
Main unit:
3672
1
—
Standards:
3-core power cord
1
USB mouse
1
—
USB keyboard
1
—
User Manual
2
—
Packing list
1
—
Certificate of Conformity
1
—
Option:
Two-port programmable step attenuator
1
Extend the output power range
and the receiving power range
of the receiver
Four-port measurement
1
Extend to four ports
Four-port programmable step attenuator
1
Extend the output power range
and the receiving power range
of the receiver
Active intermodulation measurement
1
Used for active intermodulation
signal measurement of the
amplifier
Pulse measurement
1
Used for the pulse S parameter
measurement
Time domain measurement
1
Used
for
time
domain
measurement,
determination
and
analysis
of
the
discontinuous position of the
ATTENSION
Содержание 3672 Series
Страница 1: ...3672 Series Vector Network Analyzer Quick Start Guide ...
Страница 2: ......
Страница 7: ......