22
6: BALANCED FLUE INSTALLATION
6:1 GENERAL INFORMATION
MODEL
A(mm)
B(mm)
110
175+
142
180
200
180
220
200+
180
280
225+
230
01-05-02
6:2.1 Model 110, 180 and 220 Only
Read these instructions before assembling the flue.
Site Conditions will dictate the best method.
Assembly
1. Mark Flue Position, (See Fig. 6:2a), and knock
out hole in the wall with 10mm clearance.
2. Remove both Top Panels.
3. Replace the four screws in the Rear Top Panel
with the Blanking Plate supplied.
4. If side flued, remove the appropriate Flue
Blanking Plate and move to the rear.
5. Place the Centralising Ring in position in the
Heater.
6. Measure the distance form the outside wallface
to the heater side/rear panel, L.
7. Assemble the Terminal and Air Duct, the Ter
minal slots vertical and the larger flange down,
to achieve the overall dimension of L+C. (
See
6:1b and Fig6:2a) then tape the joint.
Preferred method, flue assembled to boiler away
from wall.
8. It is recommended that a trial fitting the Flue
Elbow is now made.
9. Apply the supplied Silicone Sealant as a gener-
ous bead to the outside of the long end of the
Flue Elbow and slide it into the Terminal As-
sembly.
10.Fit the Flue Elbow to the Centralising Ring and
secure the complete Flue Assembly to the
Heater with the four nuts and washers sup
plied.
11.Move the Heater into position.
12.Caulk in the flue to the Flue Ring with the Fire
Cement and Rope supplied.
6:2 HORIZONTAL BALANCED
FLUE INSTALLATION
Содержание COH110
Страница 60: ...14 Fig 4 9b Reillo bypass adjustment 9 04 02 Fig 4 9a Reillo bypass adjustment ...
Страница 63: ...17 9 04 02 ...
Страница 82: ...36 9 04 02 ...
Страница 83: ...37 Model 220 only Fig 8 3c Model 280 only Fig 8 3d Top Top Top 9 04 02 ...
Страница 86: ...40 9 3 BURNER PARTS 9 04 02 Model 110 443T58 ...
Страница 87: ...41 29 01 08 Model 180 459T55 3007708 ...
Страница 88: ...42 29 01 08 Model 220 464T55 3007708 ...
Страница 96: ...Station Lane Industrial Estate Witney Oxon Tel 01993 778855 Fax 01993 703407 Booklet 12 M3491 7 11 02 ...