REFERENCE
EDMS NO.
REV.
VALIDITY
TOF-TAR-PRD-0001
1867100
1.0
RELEASED
Page 78 of 93
º
Name of task
570. Disconnect the
lower end of the pipes
Exposed people
2
Local dose rate
Workforce
Time needed
10 min
Calculated dose
Responsible
EN-STI
Involved
EN-EA/ EN-HE/ HSE-RP/ EN-CV
Comments:
Remove the bindings that were installed in Task 390
to keep the flexible sections out of the way.
A manual winch will be needed to recover persons in
the case of an emergency. The intervention inside
the pit will be confined space work, so all the
necessary safety measures should be taken.
Содержание ATOMTEX BDKG-24
Страница 62: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 62 of 93...
Страница 65: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 65 of 93...
Страница 68: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 68 of 93...
Страница 73: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 73 of 93...