REFERENCE
EDMS NO.
REV.
VALIDITY
TOF-TAR-PRD-0001
1867100
1.0
RELEASED
Page 82 of 93
Name of task
610. Cut the pipes and
place them into
containers
Exposed people
Local dose rate
Workforce
Time needed
Calculated dose
Responsible
EN-STI
Involved
EN-EA/ EN-HE/ HSE-RP/ EN-CV/
EN-SMM
Comments:
It is not clear if the pipes will need to be cut. In case
they need to be cut, the size is undefined at this
point.
Their activation will be measured by HSE-RP.
However, in case they need to be cut, the proposed
procedure will be:
-
Both ends will be sealed in the Technical Gallery.
-
They will be moved to the cooling station (which
will be empty at this point).
-
They will be cut there. The pipe size is the same
than in task 440, so the same shear can be used.
-
Depending on the dose, they will be cut manually
or remotely.
-
They will be placed in plastic bags, similar to
what was done in task 540.
-
The plastic bags will be placed in containers.
Содержание ATOMTEX BDKG-24
Страница 62: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 62 of 93...
Страница 65: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 65 of 93...
Страница 68: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 68 of 93...
Страница 73: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 73 of 93...