Name of task
90. Remove upper
bellow
Exposed people
Local dose rate
10 µSv/hr
Workforce
3 people
Time needed
1 hour
Calculated dose
Responsible
EN-EA
Involved
EN-EA/ EN-HE/ HSE-RP
Comments:
The upper bellow needs to be removed to allow a
flat plate to be placed over the pit.
The next section of chamber cannot be removed yet
as it holds the first collimator.
To be stored in the ISR8 Storage Area.