Installation Guide for FibeAir IP-20S, FibeAir IP-20S Assured
Page 8 of 105
Ceragon Proprietary and Confidential
1.
Before You Start
1.1
Important Notes
•
For the warranty to be honored, install the unit in accordance with the
instructions in this manual.
•
Any changes or modifications of equipment not expressly approved by the
manufacturer could void the user’s authority to operate the equipment and
the warranty for such equipment.
•
IP-20S is intended for installation in a restricted access location.
•
IP-20S must be installed and permanently connected to protective earth by
qualified service personnel in accordance with applicable national electrical
codes.
1.2
Safety Precautions & Declared Material
1.2.1
General Equipment Precautions
To avoid malfunctioning or personnel injuries, equipment or
accessories/kits/plug-in unit installation, requires qualified and trained
personnel. Changes or modifications not expressly approved by Ceragon
Networks could void the user's authority to operate the equipment.
Where special cables, shields, adapters and grounding kits are supplied
or described in this manual, these items must be used, to comply with
the FCC regulations.
Use of controls, adjustments, or performing procedures other than
those specified herein, may result in hazardous radiation exposure.
When working with an IP-20S, note the following risk of electric shock
and energy hazard:
Disconnecting one power supply disconnects only one power supply
module. To isolate the unit completely, disconnect all power supplies.
Machine noise information order - 3. GPSGV, the highest sound pressure
level amounts to 70 dB (A) or less, in accordance with ISO EN 7779.