
2.
Press button „START / STOP“, on display will
be displayed window with offered options
„NEW LOADING“ and „OFF“. Press button
„NEW LOADING“.
3.
On display is displaying boiler operating
phase „SP1".
Description of the refilling wood loading chamber:
- open upper boiler door (see pages 4 and 5 in this technical instructions).
- align the glow with scraper
- based on estimates of glow quality and amount of glow put more or less dry thin wood (depend
about estimate) and after that fill the wood loading chamber with wood
- close upper boiler door (see pages 4 and 5 in this technical instructions)
ACTION:
NEW LOADING
OFF
GLW2
SP1
Refilling
Technical instructions
BioTec Plus
87