
C
B
B
NOTE: on front side, left and right corner porters are separate adjustable.
In some cases there are 3 screws on the left and
rigt lover adjusting positions (B). Remove the
middle screws and unscrew the upper and lower
screw (don’t remove this 2 screws). Also in some
cases there can be 2 screws in the upper
adjusting position (C). Remove the screew that
is in small hole and unscrew the screw that is in
big hole (don’t remove screw in big hole)
After adjusting right boiler part cover according
to the left boiler part cover, fix it with 4 lower and 1
upper screw.
PELLET SIDE COVER ADJUSTMENT - BACK SIDE
On the back side remove lower cover to have access to the screws for adjusting the back part of
the cover.
Unscrew 2 M8 screws (don’t remove them) to be able
to adjust back side of the cover (left-right). After
adjusting the cover according to the left boiler part
cover, fix it with 2 M8 screws.
NOTE: on the back side, left and right corner porters
are connected with lower part and adjusted together.
Connecting
Technical instructions
BioTec Plus
19