
All local regulations, including those referring to national and European standards need to be
complied with when installing the appliance.
The boiler must not be modified unless using the tested
original accessories we provide or if the work is undertaken
by our Customer Service.
Only fit original
spare parts. These can be obtained from your customer service partner or directly from ourselves.
European standards need to be complied with when installing the appliance.
R
egular care and
cleaning of the appliance, flue gas outlets, connecting piece and flue.
CAUTION:
The flue may block if the boiler is heated again after a long period of it not being used. Before starting
the boiler, have the flue checked by a specialist (chimney sweep). Ensure sufficient supply of fresh air
in the installation room when heating. The air must be replaced at least 0.8 times an hour through
constant and reliable room venting. Fresh air may have to be provided from outside if the windows
and doors in the room where the boiler is installed are well sealed or if this room contains other
equipment, such as extractor hoods, clothes dryer, fan etc.
1.2. SAFETY PRECAUTIONS
1.3. IMPORTANT INFORMATIONS
This symbol indicates measures for protection against accidents and warning
for the user and / or exposed persons.
T
he boiler and related accessories are state of the art and meet all applicable safety regulations.
The control unit, wiring chamber, el. heater, safety cut-out
STB
thermostat, fan, grid cleaning
mechanism
,
flue gas tubes cleaning mechanism
and
pellet supply mechanism
are integrated into the
BioTec Plus
. They are operate at a voltage of 230V AC. Improper installation or repair can pose the
danger of life-threatening electric shock. Installation may beperformed only by appropriately qualified
technicians.
Caution symbols:
Please take careful note of the following symbols in this Operating Manual.
Concerning the specific need of sanitary hot water, the BioTec Plus boiler can be connected to one of
water heaters produced by our company
.
We suggest the combination with wall hanged SKB Digi or
LKB Digi water heaters, as well as with floor standing TB water heaters or accumulation
(buffer)
tanks
CAS-B. If the future connection to the solar system has been planned, boiler can be connected to
combined accumulation
(buffer)
tank CAS-BS or STB solar water heater. Boiler is tested and certified
according to the European standard EN
303-5:2012
and meets
class 5
. It is manufactured in
compliance with ISO 9001 and ISO 14001 standards.
Although the boiler has two separate furnaces, boiler connects to one properly selected chimney.
Safety precautions, important informations
Technical instructions
BioTec Plus
8