
CONNECTING LEFT AND RIGHT SIDE OF THE BOILER
Left part of the boiler
(fuel: wood)
Right part of the boiler
(fuel: wood pellets)
Detail 1
Detail 2
Detail 1
Detail 2
Prepared flange with holes on left part
of the boiler. First hole (left) have circle
shape, other five holes are slitted (have
possibility for height niveling).
Prepared flange on right side of the
boiler. Flange have factory glued
gasket and factory mounted six screws
M12.
Connecting
Technical instructions
BioTec Plus
14