Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53480267-01
Printed in U.S.A.
Form 48LCB-14-26-02SI
Pg CL-1
9-19
Replaces: 48LCB-14-26-01SI
START-UP CHECKLIST
(Remove and Store in Job File)
I. PRELIMINARY INFORMATION
MODEL NO. ____________________________________________
JOB NAME _____________________________________________
SERIAL NO.. ___________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit (Y/N) _____
Verify installation of duct pressure transducer (Y/N) _____
Verify installation of outdoor air hood (Y/N) _____
Verify installation of flue exhaust and inlet hood (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Verify gas pressure to unit gas valve is within specified range (Y/N) _____
Check gas piping for leaks (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor-air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat (Y/N) _____
Verify that crankcase heaters have been energized for at least 24 hours (Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage
L1-L2_____________
L2-L3_____________
L3-L1_____________
Compressor Amps 1
L1 _____________
L2 _____________
L3 _____________
Compressor Amps 2
L1 _____________
L2 _____________
L3 _____________
Supply Fan Amps
L1 _____________
L2 _____________
L3 _____________
TEMPERATURES
Outdoor-air Temperature
_____________ °F DB (Dry Bulb)
Return-air Temperature
_____________ °F DB
_____________
°
F WB (Wet Bulb)
Cooling Supply Air Temperature
_____________ °F
Gas Heat Supply Air Temperature
_____________ °F
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Installation Instruction document.
Содержание WeatherExpert 48LC B14 Series
Страница 4: ...4 Fig 2 48LC B14 Vertical Airflow ...
Страница 5: ...5 Fig 3 48LC B14 Horizontal Airflow ...
Страница 6: ...6 Fig 4 48LC B14 Back View and Condensate Drain Location ...
Страница 7: ...7 Fig 5 48LC B14 Corner Weights and Clearances ...
Страница 8: ...8 Fig 6 48LC B14 Bottom View ...
Страница 9: ...9 Fig 7 48LC B17 20 Vertical Airflow ...
Страница 10: ...10 Fig 8 48LC B17 20 Horizontal Airflow ...
Страница 11: ...11 Fig 9 48LC B17 20 Back View and Condensate Drain Location ...
Страница 12: ...12 Fig 10 48LC B17 20 Corner Weights and Clearances ...
Страница 13: ...13 Fig 11 48LC B17 20 Bottom View ...
Страница 14: ...14 Fig 12 48LC B24 26 Vertical Airflow ...
Страница 15: ...15 Fig 13 48LC B24 26 Horizontal Airflow ...
Страница 16: ...16 Fig 14 48LC B24 26 Back View and Condensate Drain Location ...
Страница 17: ...17 Fig 15 48LC B24 26 Corner Weights and Clearances ...
Страница 18: ...18 Fig 16 48LC B24 26 Bottom View ...
Страница 21: ...21 Fig 20 48LC B14 Roof Curb Details ...
Страница 22: ...22 Fig 21 48LC B17 20 Roof Curb Details ...
Страница 23: ...23 Fig 22 48LC B24 26 Roof Curb Details ...
Страница 30: ...30 Fig 40 48LC B14 26 VAV RTU Open Control Wiring Diagram ...
Страница 31: ...31 Fig 41 48LC B14 26 Power Wiring Diagram ...
Страница 53: ......