
23/04/2019
Rev 3
23
II.4.
Emission test
II.4.1.Preliminary checks
Place the machine in the desired location. The surface must be
horizontal and must not be exposed to excessive vibrations, dust or
cold. There must be no petrol vapor in the location.
Connect the hose and probe to the separator located at the rear side.
Do not insert the probe into the exhaust pipe at this stage.
Press the Stop/Start switch on the station.
II.4.2.Cleaning and operating cautions
Current regulation:
This device is a 4 gas analyzer complying with ISO 3930, MID certification.
This device required little maintenance. The pneumatic circuit components that carry the gases
on, located on the outside of the analyzer, only need to be maintained by the user. Any
maintenance operation, other than those described below, must be entrusted to a certified
CAPELEC agent. On the other hand, failing to maintain the machine in conformity with these
instructions may lead to the warranty abolition.
The subsequent verification shall be carried out using suitable testing means and certified
reference gases.
The interval for subsequent verification is subject to national or regional legislation. This
Recommendation, however, suggests an interval not exceeding 1 year.
II.4.2.1.Bi-annual maintenance
Change the separator filter FD,
Change filters FC and FG,
Visually check that the filter connections are in conformity with gas flow
circuit diagram.
Visual inspection of the sampling probe. Clean it if necessary.
Perform a leak test.
Store the new maintenance date.
II.4.2.2.Annual maintenance
Annual maintenance operations include the bi-annual maintenance operations. In addition, it is
necessary to carry out the following operations:
Replace the pump protection filters (FG and FC),
Содержание EOBD
Страница 2: ......
Страница 7: ...23 04 2019 Rev 3 4 I 2 Overview I 2 1 The Station ...
Страница 10: ...23 04 2019 Rev 3 7 I 2 4 Smoke meter Exhaust probe ...
Страница 13: ...23 04 2019 Rev 3 10 CAP4XXX RPM via the EOBD Allows to measure the RPM from the vehicle embedded computer ...
Страница 23: ...23 04 2019 Rev 3 20 II 1 3 Gas flow circuit diagram ...
Страница 63: ...23 04 2019 Rev 3 60 ...