Chapter 10
10-102
10.10.50.2 Removing the Delivery Vertical
Path Roller 2
1) Remove the gear [1], the belt [2] and the bushing
[3].
F-10-280
2) Remove the delivery vertical roller 2 [4].
- gear [1]
- belt [2] at the rear
- bushing [3]
F-10-281
10.10.51 Face-Down Delivery Motor
10.10.51.1 Preparation for Removing the
Face-Down Delivery Motor
1) Remove the upper left cover.
Reference[Removing the Upper Left Cover]
2) Remove the center delivery tray [2].
(Referring to procedure 10.10.54)
3) Remove the delivery vertical path unit.
Reference[Removing the Delivery Vertical
Path Unit]
10.10.51.2 Removing the Face-Down
Delivery Motor
1) Remove the face-down delivery motor [5].
- 1 Harness [2] (free from the wire saddle [1])
- 1 Connector [3]
- 2 Screw [4]
F-10-282
10.10.52 Delivery Vertical Path Motor
10.10.52.1 Preparation for Removing the
Delivery Vertical Path Motor
1) Remove the upper left cover.
Reference[Removing the Upper Left Cover]
2) Remove the center delivery tray [2].
(Referring to procedure 10.10.54)
3) Remove the delivery vertical path unit.
Reference[Removing the Delivery Vertical
Path Unit]
[1]
[2]
[3]
[4]
[3]
[1]
[2]
[2]
[4]
[3]
[1]
[5]
[4]
Содержание Color imageRUNNER C5180 Series
Страница 22: ...Chapter 1 INTRODUCTION...
Страница 64: ...Chapter 2 INSTALLATION...
Страница 110: ...Chapter 3 BASIC OPERATION...
Страница 119: ...Chapter 4 BASIC OPERATIONS AS A PRINTER...
Страница 129: ...Chapter 5 MAIN CONTROLLER...
Страница 132: ...Chapter 5 5 2 F 5 1 A Reader Unit B DC controller Circuit Board C Printer Unit A B C HDD 1 2 3 3 4 5 6 7 8 9...
Страница 138: ...Chapter 5 5 8 F 5 8 CPU HDD ROM access to the program at time of execution...
Страница 165: ...Chapter 6 ORIGINAL EXPOSURE SYSTEM...
Страница 209: ...Chapter 7 IMAGE PROCESSING SYSTEM...
Страница 210: ...Contents Contents 7 1 Digital Image Processing 7 1 7 1 1 Overview 7 1 7 1 2 Shading Correction 7 1...
Страница 212: ...Chapter LASER EXPOSURE 8...
Страница 239: ...Chapter 9 IMAGE FORMATION...
Страница 324: ...Chapter 10 PICKUP FEEDING SYSTEM...
Страница 355: ...Chapter 10 10 28 F 10 30 F 10 31 9 1 2 3 4 5 1 2 3 4 5 10 thereafter repeats 7 through 10 11 1 2 3 4 5 12 1 2 3 4 5...
Страница 358: ...Chapter 10 10 31 F 10 36 F 10 37 5 1 2 6 1 2 in wait for re pickup point of reversal 9 1 2 3 10 1 2 3...
Страница 435: ...Chapter 11 FIXING SYSTEM...
Страница 460: ...Chapter 11 11 23 F 11 13 SEN3 SEN2 SEN1 SEN2 SEN3 SEN1 SEN2 SEN3 SEN1...
Страница 491: ...Chapter 12 EXTERNALS CONTROLS...
Страница 498: ...Chapter 12 12 5 F 12 2 FM1 FM7 FM9 FM2 FM13 FM14 FM12 FM11 FM10 FM5 FM3 FM4 FM8 FM6...
Страница 512: ...Chapter 12 12 19 2 Remove the check mark from SNMP Status Enabled F 12 10...
Страница 553: ...Chapter 13 MEAP...
Страница 557: ...Chapter 14 RDS...
Страница 569: ...Chapter 15 MAINTENANCE INSPECTION...
Страница 578: ...Chapter 16 STANDARDS ADJUSTMENTS...
Страница 597: ...Chapter 17 CORRECTING FAULTY IMAGES...
Страница 612: ...Chapter 17 17 14 F 17 7 PLG1 ELCB1 SP1 H4 H3 H2 H1 H1 H2 LA1...
Страница 617: ...Chapter 18 SELF DIAGNOSIS...
Страница 644: ...Chapter 19 SERVICE MODE...
Страница 778: ...Chapter 20 UPGRADING...
Страница 823: ...Chapter 21 SERVICE TOOLS...
Страница 824: ...Contents Contents 21 1 Service Tools 21 1 21 1 1 Special Tools 21 1 21 1 2 Solvents and Oils 21 2...
Страница 828: ...APPENDIX...
Страница 851: ......