CANNON Instrument Company | Initial Startup
41
3.
Watch the Force value on the
Instrument Status Bar
and adjust the Control Unit ZERO
pressure dial until the load reading displayed is 35 mN ± 10 mN.
4.
Switch to the LOAD
mode (Control Unit front panel, left side) and adjust the LOAD
regulator
until the computer display reading for the load is 980 ± 50 mN.
5.
Switch back to the ZERO
mode and check to see if the shaft has drifted up off the beam. If so,
repeat the load procedure.
6.
Manually raise the shaft enough to remove the stainless steel beam.
7.
Manually raise the haft enough to remove the stainless steel beam.
Содержание TE-BBR
Страница 1: ...Instruction Operation Manual 44 0991 Thermo Electric Bending Beam Rheometer TE BBR ...
Страница 2: ......
Страница 10: ......
Страница 11: ......
Страница 44: ...CANNON Instrument Company Software Menu Options 33 Figure 17 Toolbar Options ...
Страница 47: ...36 TE BBR Instruction and Operation Manual Figure 18 Mold Specimen Diagram ...
Страница 70: ...CANNON Instrument Company Troubleshooting 59 Figure 25 Diagram A new Figure 26 Diagram B old ...
Страница 85: ...74 TE BBR Instruction and Operation Manual Figure 31 Graph View ...