TE-BBR Instruction and Operation Manual
Exchanger/Refrigeration
Place the Refrigeration Unit (BBR model) or Air/Water Heat Exchanger (TE-BBR model) on the floor
below the Control Unit. Do not place the unit on the same table as the Control Unit as the fan/motor
vibration can interfere with the sensitive measuring system of the Load Unit. Also, it is necessary to
provide 15 cm (6") of clearance on all sides of the unit for sufficient air circulation. Clearance
requirements for refrigeration units may vary depending on the model.
Note:
If a compressor has been purchased to supply compressed gas, place it on
the floor or at a location removed from the test apparatus to prevent the
compressor vibration from interfering with the Load Frame measurements.
Содержание TE-BBR
Страница 1: ...Instruction Operation Manual 44 0991 Thermo Electric Bending Beam Rheometer TE BBR ...
Страница 2: ......
Страница 10: ......
Страница 11: ......
Страница 44: ...CANNON Instrument Company Software Menu Options 33 Figure 17 Toolbar Options ...
Страница 47: ...36 TE BBR Instruction and Operation Manual Figure 18 Mold Specimen Diagram ...
Страница 70: ...CANNON Instrument Company Troubleshooting 59 Figure 25 Diagram A new Figure 26 Diagram B old ...
Страница 85: ...74 TE BBR Instruction and Operation Manual Figure 31 Graph View ...