CANNON Instrument Company | Electrical Connections
15
Electrical Connections
Load/Control Unit Connections
There are four color-coded electrical receptacles on the rear panel of the Load Frame. Using the
cables supplied, connect the Load Frame receptacles to those of corresponding color on the rear
panel of the Control Unit. Refer to Figure 8 and Figure 9.
Figure 8: Electrical Connections – Load Frame Figure 9: Electrical Connections – Control Unit
Control Unit – Heat Exchanger Connections
Make certain the power switch on the TE-BBR is in the OFF (O) position. Then connect the two large
power cables between the air/water heat exchanger and the rear panel of the Control Unit. Refer to
Figure 10. The connections are keyed and will only fit one way. Insert the MAINS power cord into
the MAINS outlet on the Air/Water Heat Exchanger and plug the other end into a suitable receptacle
matching the electrical specifications on the rear of the unit.
Figure 10: Air/Water Heat Exchanger Power Connections
Содержание TE-BBR
Страница 1: ...Instruction Operation Manual 44 0991 Thermo Electric Bending Beam Rheometer TE BBR ...
Страница 2: ......
Страница 10: ......
Страница 11: ......
Страница 44: ...CANNON Instrument Company Software Menu Options 33 Figure 17 Toolbar Options ...
Страница 47: ...36 TE BBR Instruction and Operation Manual Figure 18 Mold Specimen Diagram ...
Страница 70: ...CANNON Instrument Company Troubleshooting 59 Figure 25 Diagram A new Figure 26 Diagram B old ...
Страница 85: ...74 TE BBR Instruction and Operation Manual Figure 31 Graph View ...