Operator Manual
BB3002 Page 12
Initial issue: 05/08
Latest revision: 11/08
Operator Manual
Page 12
Initial issue: 05/08
Latest revision: 12/08
Inside the power rack :
On the back (inside) :
BBR :
L
3
L
2
L
1
Power supply
connection
WARNING
High leakage current
earth connection essential before
connecting supply
ATTENTION
Courant de fuite élevé
Raccordement à la terre indispensable
avant le raccordement au réseau
9.139.163A
WARNING
High leakage
earth connection
connecting supply
ATTENTION
Courant de fuite élevé
Raccordement à la terre i
n
avan
t le raccordement au ré
s
Note: Risk of injury to your fingers if you
take the booklets in this area.
Note: The book can be manipulate
approximately after
1
min.
30
.
The
gluing is optimal after
24
hours.
Содержание BB3002 PUR
Страница 7: ...Operator Manual Page 7 Initial issue 05 08 Latest revision 11 08 Environmental compliance 141...
Страница 9: ...Operator Manual BB3002 Page 9 Initial issue 05 08 Latest revision 11 08 BB3002...
Страница 82: ...Operator Manual BB3002 Page 82 Initial issue 05 08 Latest revision 11 08 5 4 Not available...
Страница 103: ...Operator Manual BBL Page 103 Initial issue 09 13 Latest revision BBL...
Страница 120: ...Operator Manual BBC Page 120 Initial issue 09 13 Latest revision BBC...