Operator Manual
BBC Page 129
Initial issue: 09/13
Latest revision: -
Initial issue: 08/13
Latest revision: 12/14
Sheet flipper description:
There are
3
options available
N
Waste bin: When the waste bin is selected with a number of sheets (N) to be send to the
waste bin, the (N) first sheets of the set will be sent to the waste bin before compiling
sheets.
Flip off: The sheet (flat or folded) selected will not be flipped.
Flip on: The sheet (flat or folded) selected will be flipped.
Note: When a flipped sheet is followed by a non flipped, the two sheets are merged to be
stack together.
When two consecutive sheets are flipped, max rate is reduced
The selected flip sequences work in a loop
See following examples:
1
Sheets printed with lead and trail edges and cutted in the middle should be stack in the
same way.
In this case, the first sheet is not flipped and the second sheet is flipped in order to have lead
and trail edges of the sheets stacked in the same way.
2
Sheets delivered in a bad way should be flipped to avoid a manual manipulation to put
the sheets in the right order to be bind.
In this case, all the sheets are flipped in order to be stack in the good way.
3
Folded sheets provided by a BPRF are not flipped and stacked on the compiler in the
same way before be send to the binder.
In this case, sheets are simply stacked in the same way on the compiler.
The opposed side of the fold will be bond
4
Folded sheets provided by a BPRF are flipped and stacked on the compiler in the same
way before be send to the binder
In this case, all the sheets are flipped and stacked in the same way on the compiler.
The fold of the sheets will be bond.
5
Folded sheets provided by a BPRF are flipped alternately and stacked on the compiler
before be send to the binder
In this case, the first sheet is not flipped and second sheet is flipped in order to have sheets
stacked in opposite on the compiler, this reduce the height of the pile on the compiler and allow
to send more sheets to the binder.
6
Same work as for example
5
but the two first sheets are send to the waste bin before the
job starts.
Содержание BB3002 PUR
Страница 7: ...Operator Manual Page 7 Initial issue 05 08 Latest revision 11 08 Environmental compliance 141...
Страница 9: ...Operator Manual BB3002 Page 9 Initial issue 05 08 Latest revision 11 08 BB3002...
Страница 82: ...Operator Manual BB3002 Page 82 Initial issue 05 08 Latest revision 11 08 5 4 Not available...
Страница 103: ...Operator Manual BBL Page 103 Initial issue 09 13 Latest revision BBL...
Страница 120: ...Operator Manual BBC Page 120 Initial issue 09 13 Latest revision BBC...