70
d. Remove the ignition electrode and inspect it for oxides. Clean the oxides off the electrode with sandpaper. Inspect
the ceramic insulator for cracks and replace the ignitor assembly if necessary.
e. Remove the fan/gas valve assembly from the burner hood. Inspect for lint and dust. If significant lint and dust are
found, disassemble the fan/gas valve assembly to expose the swirlplate and fan inlet (see the exploded diagram in
the parts list at the back of this manual). Vacuum these parts as required, being careful not to damage the vanes on
the swirlplate.
f. Remove the burner hood to access the burner and the combustion chamber.
g. Remove the burner and vacuum any dust or lint from the burner. If the burner shows signs of deterioration or
corrosion, replace it immediately. Inspect the burner gasket and replace, if necessary.
h. Inspect the heat exchanger and vacuum any debris found on the pins and other surfaces. Clean the casting pins by
flushing with clean water. A soft nylon brush may be used in accessible areas. Drain and flush the inside of the heat
exchanger and condensate collector as required. Do not use any cleaning agents or solvents.
i. Inspect the condensate trap to verify it is open and free from debris. Clean if necessary.
j. Reinstall the burner, burner hood and fan/gas valve assembly.
k. Reconnect any wiring which has been disconnected.
l. Inspect the heating system and correct any other deficiencies prior to restarting the boiler.
m. Follow Section XI Start-up and Checkout instructions before leaving installation.
n. Perform the combustion test outlined in Section XI.
o. Verify that the system PH is between 6.5 and 8.5.
p. Check for vent terminal obstructions and clean as necessary.
Содержание FREEDOM
Страница 8: ...8 Figure 1 Wall Mounting Hole locations ...
Страница 9: ...9 Figure 5 2 Boiler Mounting Hardware ...
Страница 11: ...11 Figure 6 1 Boiler Installed In A Confined Space Ventilation Air From Inside ...
Страница 24: ...24 Figure 7 20 Installation of Reducing Elbow on Concentric Boiler Collar Figure 7 21 Dimension L ...
Страница 34: ...34 Figure 7 35b Cutting Vertical Terminal Figure 7 35c Completing Vertical Terminal Installation ...
Страница 42: ...42 FIGURE 7 51 CONDENSATE PIPING ARRANGEMENT ...
Страница 55: ...55 Figure 10 1 Wiring Connections Diagram ...
Страница 56: ...56 Figure 10 2 Ladder Diagram ...
Страница 57: ...57 Figure 10 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Страница 60: ...60 FCM Series Lighting and Operating Instructions ...
Страница 66: ...66 FIGURE 12 2 BASIC MENU TREE ...
Страница 75: ...75 ...
Страница 77: ...77 ...
Страница 79: ...79 ...
Страница 80: ...80 ...
Страница 81: ...81 ...
Страница 83: ...83 150 151 152 153 154 155 ...
Страница 84: ...84 156 157 158 159 160 161 ...
Страница 85: ...85 162 ...