9
XIII. Service and Maintenance
iMPOrTanT
WarranTY DOEs nOT COVEr bOilEr DaMagE Or MalFunCTiOn iF THE
FOllOWing sTEPs arE nOT PErFOrMED aT THE inTErVals sPECiFiED
1) Continuously:
a. Keep the area around the boiler free from combustible materials, gasoline and other flammable vapors and liquids.
b. Keep the area around the combustion air inlet terminal free from contaminates .
c. Keep the boiler room ventilation openings open and unobstructed.
2) Monthly Inspections:
a. Inspect the vent piping and outside air intake piping to verify they are open, unobstructed and free from leakage or
deterioration. Call the service technician to make repairs if needed.
b. Inspect the condensate drain system to verify it is leak tight, open and unobstructed. Call the service technician if the
condensate drain system requires maintenance.
c. Inspect the water and gas lines to verify they are free from leaks. Call the service technician to make repairs if
required.
4) Annual Inspections and Service: In addition to the inspections listed above the following should be performed by a
service technician once every year.
a. Test the low water cutoff by pressing the “Test” button located at its end. The yellow light should come on and
“E12” should flash on the display. Push the reset button on the display to restore normal operation. If the yellow
light does not come on, determine why the low water cutoff is not working properly.
b. Follow the procedure for turning the boiler off found in the FCM Series Lighting and Operating Instructions.
c. Inspect the wiring to verify the conductors are in good condition and attached securely.
CauTiOn
WaTEr lEaKs Can CausE sEVErE COrrOsiOn DaMagE TO THE bOilEr
Or OTHEr sYsTEM COMPOnEnTs. iMMEDiaTElY rEPair anY lEaKs
FOunD.
CauTiOn
labEl all WirEs PriOr TO DisCOnnECTiOn WHEn sErViCing
COnTrOls. Wiring ErrOrs Can CausE iMPrOPEr anD DangErOus
OPEraTiOn. VEriFY PrOPEr OPEraTiOn aFTEr sErViCing.
Содержание FREEDOM
Страница 8: ...8 Figure 1 Wall Mounting Hole locations ...
Страница 9: ...9 Figure 5 2 Boiler Mounting Hardware ...
Страница 11: ...11 Figure 6 1 Boiler Installed In A Confined Space Ventilation Air From Inside ...
Страница 24: ...24 Figure 7 20 Installation of Reducing Elbow on Concentric Boiler Collar Figure 7 21 Dimension L ...
Страница 34: ...34 Figure 7 35b Cutting Vertical Terminal Figure 7 35c Completing Vertical Terminal Installation ...
Страница 42: ...42 FIGURE 7 51 CONDENSATE PIPING ARRANGEMENT ...
Страница 55: ...55 Figure 10 1 Wiring Connections Diagram ...
Страница 56: ...56 Figure 10 2 Ladder Diagram ...
Страница 57: ...57 Figure 10 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Страница 60: ...60 FCM Series Lighting and Operating Instructions ...
Страница 66: ...66 FIGURE 12 2 BASIC MENU TREE ...
Страница 75: ...75 ...
Страница 77: ...77 ...
Страница 79: ...79 ...
Страница 80: ...80 ...
Страница 81: ...81 ...
Страница 83: ...83 150 151 152 153 154 155 ...
Страница 84: ...84 156 157 158 159 160 161 ...
Страница 85: ...85 162 ...