5) Assembly of Heat Fab Saf-T Vent EZ Seal:
a) Saf-T Vent General Notes:
• These instructions cover the installation of Saf-T Vent EZ Seal. Saf-T Vent EZ Seal piping has integral gaskets
installed in the female ends of the pipe which seal the joints.
• In general, Saf-T Vent pipe sections may not be cut. Exceptions to this are the Saf-T Vent slip connector and
connections to the boiler vent collar. In these cases, use a sharp pair of aviation snips, an abrasive cut-off, or a
plasma cutter. See the Saf-T Vent instructions for information on cutting the slip connector.
• Orient Saf-T Vent components so that the arrows on the piping labels are in the direction of flue gas flow.
• Support horizontal piping sections at intervals of 6 feet or less.
• Vertical venting systems must be supported by at least one Heat Fab support. An additional vertical support is
required after any offset.
b) Connection to Boiler – Start assembly of the vent system at the boiler. Remove the hose clamp shipped on the FCM
vent collar. Bend the three hose clamp tabs on this collar outward slightly. Cut the “male spigot” off of the first piece
of pipe (Figure 7.49). If necessary, crimp the cut end of the pipe so that it can be inserted at least 1” into the collar.
Clean the exterior of the male end of the first piece of pipe and the inside of the vent collar on the boiler with an
alcohol pad. On the male end of the pipe, apply a ¼” wide bead of high temperature silicone approximately ½ inch
from the male end of the pipe. Also apply a ¼” bead of silicone along the first 2½” of the longitudinal weld. Insert
the male end of the pipe into the boiler vent collar until it bottoms out. Apply an additional bead of silicone over the
outside of the joint and smooth out (Figure 7.49). Replace and tighten the clamp on the vent collar.
c) Assembly of Saf-T Vent EZ Seal Vent Components - Clean the male end of the next piece of pipe with an alcohol
pad and make sure that it is free of burrs. Check the female end of the first piece of pipe to make sure that the gasket
is in place and is undamaged. Using a slight twisting motion, insert the male end of the second fitting into the female
end of the first fitting, taking care not to dislodge or cut the factory gasket. In extremely arid conditions, it may be
easier to assemble these fittings if the gasket is moistened with water prior to assembly. Bend the locking tabs over the
locking ring on the adjacent piece of pipe. Repeat these steps for the remaining Saf-T-Vent components.
FigurE 7.9: saF-T VEnT EZ sEal COnnECTiOn TO VEnT COllar
Содержание FREEDOM
Страница 8: ...8 Figure 1 Wall Mounting Hole locations ...
Страница 9: ...9 Figure 5 2 Boiler Mounting Hardware ...
Страница 11: ...11 Figure 6 1 Boiler Installed In A Confined Space Ventilation Air From Inside ...
Страница 24: ...24 Figure 7 20 Installation of Reducing Elbow on Concentric Boiler Collar Figure 7 21 Dimension L ...
Страница 34: ...34 Figure 7 35b Cutting Vertical Terminal Figure 7 35c Completing Vertical Terminal Installation ...
Страница 42: ...42 FIGURE 7 51 CONDENSATE PIPING ARRANGEMENT ...
Страница 55: ...55 Figure 10 1 Wiring Connections Diagram ...
Страница 56: ...56 Figure 10 2 Ladder Diagram ...
Страница 57: ...57 Figure 10 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Страница 60: ...60 FCM Series Lighting and Operating Instructions ...
Страница 66: ...66 FIGURE 12 2 BASIC MENU TREE ...
Страница 75: ...75 ...
Страница 77: ...77 ...
Страница 79: ...79 ...
Страница 80: ...80 ...
Страница 81: ...81 ...
Страница 83: ...83 150 151 152 153 154 155 ...
Страница 84: ...84 156 157 158 159 160 161 ...
Страница 85: ...85 162 ...