Page 5
29877 120203
ELECTRICAL HOOK-UP
CAUTION –
Improper electrical installation will damage electronic components.
1. An electrician must provide electrical service as specified.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Remove the front panel beneath the sprayheads.
4. Feed the cord through the strain relief and connect it to the terminal block.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Replace
the front panel.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for
Initial Set-Up.
PLUMBING REQUIREMENTS
This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138
and 620 kPa) from a
1
⁄
2
" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install
a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water
inlet fitting is
1
⁄
4
" flare or female quick connect.
NOTE –
Bunn-O-Matic recommends
1
⁄
4
" copper tubing for installations of less than 25 feet and
3
⁄
8
" for more than
25 feet from the
1
⁄
2
" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer
to clean the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The
size and shape of the hole made in the supply line by this type of device may restrict water flow.
This equipment must be installed to comply with the Basic Plumbing Code of the
Building Officials and Code Administrators International, Inc. (BOCA)
and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).
PLUMBING HOOK-UP
1. Flush the water line and securely attach it to the flare fitting located on bottom of brewer.
2. Turn on the water supply.
ELECTRICAL REQUIREMENTS
CAUTION -
The brewer must be disconnected from the power source until specified in
Initial Set-Up.
120V A.C.
120V A.C.
120V A.C.
208 or 240V A.C.
L2 RED
L2 RED
WHITE
NEUTRAL
L1 BLACK
L1 BLACK
200 or 240V A.C.
Requires 2-wire, grounded
service rated 200, 230 or 240
volts ac, 30 amp, single phase
50 or 60 Hz.
Requires 3-wire, grounded ser-
vice rated 120/208 or 120/240
volts ac, 30 amp, single phase,
60 Hz.