Reports
16
60
Installation instructions Logamax plus GB142-24/30/45/60 • version 10/2007
Buderus • http://www.buderus.net
We reserve the right to make any changes due to technical modifications!
16.3 Maintenance report
z
Sign for the maintenance activities that you have carried
out and enter the date.
Needs-dependent maintenance activities
Page Date: _____________
Date: _____________
1.
Clean the burner, the heat exchanger and the condensate trap.
First shut down the heating system
49
2.
Check and adjust the gas/air ratio
CO
2
content with full load
CO
2
content with partial load
34
_____________ inch W.C.
_______________ %
_______________ %
_____________ inch W.C.
_______________ %
_______________ %
3.
Confirm proper maintenance
Company stamp/
Signature
Company stamp/
Signature