Installation
6
22
Installation instructions Logamax plus GB142-24/30/45/60 • version 10/2007
Buderus • http://www.buderus.net
We reserve the right to make any changes due to technical modifications!
Below are approved examples of vertical and horizontal
venting installation
Fig. 17
Vent and air pipe position (2) of a system with combustion air supply from the room (non-room sealed)
1'
Gravity Air Inlet
3'
3'
1'
at least 1 ft (305 mm)
above grade and snow line
4'
4'
Forced
Air Inlet
7'
4'
1'
Exha
u
st terminal m
u
st be at least 3 ft (915 mm)
above forced air inlet within 10 ft (3050 mm)
3'
5'
(2135 mm)
(305 mm)
(1220 mm)
(1525 mm)
(1220 mm)
(915 mm)
(915 mm)
(305 mm)
(305 mm)
(1220 mm)
(1220 mm)
Fig. 18
Vertical venting system (sealed combustion)
INTAKE
EXHAUST
10"- 0" MIN
(250 mm - 0 mm MIN)
12" (300 mm) OVER MAXIMUM
SNOW LEVEL OR 24" (600 mm)
WHICHEVER IS
GREATER
3" (80 mm)
3" (80 mm)
1
NOTICE
Place pipe supports every 5 feet (1525 mm) of
horizontal run, beginning with support near
boiler.
NOTICE
The condensate water must be drained in
accordance with the applicable rules. See
chapter 7 „Connecting the condensate drain“.
NOTICE
Periodic cleaning of the vent terminal and
air-intake screens is mandatory.