
5 Putting into operation
41
B-90
Operation Manual, Version B
Special mounting
tool in position.
Cylinder assembly short set-up
2
a
Mount a flat sealing ring on the bottom of the spray
cylinder.
b
Position the second flat sealing ring on the spray
cylinder.
c
Place the spray cylinder on the centerpiece holder.
All sealings are part of the sealing set (order no. 051778).
5.3.4
Heater module installation
!
Caution
Risk of minor or moderate burning when handling hot parts.
• Do not touch hot parts
• Let the system cool down for some minutes after use
2
5
The special mounting tool serves as a mounting gauge
for the correct distance of all mounted parts between
lifting device and heater.
• Put the lever arm of the lifting device into the end
a
of the tool first. The tool and the handle are
equipped with holes. Line up all holes and insert
a hex-wrench through the holes to stabilize the
correct tool position.
• Use the left metal bar to support the tool end
b
.
The lifting device is now in mounting height for the
heater module installation.
Содержание Nano B-90
Страница 1: ...093261 en Nano Operation Manual Spray Dryer B 90...
Страница 2: ......
Страница 101: ...11 Declarations and requirements 101 B 90 Operation Manual Version B 11 2 Declaration of conformity...
Страница 102: ......
Страница 103: ......