5 Putting into operation
38
B-90
Operation Manual, Version B
5.3.2
Electrode assembly installation
!
Caution
Risk of minor or moderate injury by electric shock.
• Switch off the instrument before connecting or disconnecting the high-voltage cable
• Do not touch the high-voltage cable with wet hands
• Use only damage free cabling
NOTE
Before installing the electrode, clean all parts
a
to
e
thoroughly.
a
Position the flat seal at the particle collector
basement.
b
Position the metal collecting tube electrode
on the collector basement and assure elec-
trical contact. The broader uncoated stripe
at the lower outer side is to be installed
towards the base.
c
Install the insulation glass cylinder on the
collector basement.
d
Place the assembly on the lifting device.
Содержание Nano B-90
Страница 1: ...093261 en Nano Operation Manual Spray Dryer B 90...
Страница 2: ......
Страница 101: ...11 Declarations and requirements 101 B 90 Operation Manual Version B 11 2 Declaration of conformity...
Страница 102: ......
Страница 103: ......